GPR performed survey, design, permitting and construction administration for an 18,000 GPD wastewater treatment plant using an emergent groundwater discharge approach. The plant services a 24-hour critical care facility with constant sewage flow. Design challenges included high groundwater, fine-grained soils, and an accelerated permit schedule, requiring close coordination with the Massachusetts Department of Environmental Protection.

 

The wastewater treatment system was designed to produce effluent having a total nitrogen level of less than 10 PPM. Four treatment stages were constructed, including primary settling, BOD removal / nitrification, anoxic denitrification, and UV disinfection. GPR also designed a 7,200 SF leaching bed for effluent disposal to the ground. The bed section includes a subsurface aggregate drain to carry treated effluent to daylight and then to a surface discharge channel during periods of prolonged high groundwater.

<< Previous  Next >>

 

About GPR ] Services ] Experience ] Opportunities ] Articles ] Links ]

For more information, please contact info@gpr-inc.com

© Goldsmith, Prest & Ringwall, Inc. 2003